HOME

THE PROJECT



INSULA V 1



POMPEII REVIVED



MEMBER'S FORUM



STAFF & ANNUAL
FIELDWORK


PUBLICATIONS

LINKS

ACKNOW-
LEDGEMENTS


V 1,25 Taberna, - Installations in floor
A. Karivieri & R. Forsell Page updated: 2015-08-26
DESCRIPTION
Stone foundation built aganst the E wall of V.1. 25

Foundation built in opus incertum, consists of limestone, cruma, lava. Large limestone blocks in the S part as steps. SW corner is partly destroyed. Behind the foundation, there are remains of wall plaster.

The N half of the foundation seems to be a modern construction, built with cement, and the top level is below the level of the first step. During the cleaning of the floor level in 2005, we found out that the N edge of this part did not rest on any floor, but on lapilli and a marble spolium under the NW corner partly covering the cess pitl of the latrine in the NE corner of the taberna. This stone foundation presumably supported the lowest part of a wooden ladder leading up to the second floor.


Maximera MEASUREMENTS
Length 2.0 m. Depth 0.89 m. Height S: 0.56 m; N: 0.39 m. Height of the step 0.19 m.

Depth of the step above the base: 0.62 m.
NAVIGATE
DOCUMENTATION & ANALYSIS
V 1,1.32 Taberna
V 1,2 Taberna
V 1,3 House
V 1,4 Tinctoria
V 1,5 Tinctoria
V 1,6 Taberna
V 1,7 Casa del Torello
V 1,8 Taberna
V 1,13 Caupona
V 1,14-16 Bakery
V 1,17 Taberna
V 1,18 Casa degli Epigrammi
    greci

V 1,19 Taberna
V 1,20-21 Taberna
V 1,22 Taberna
V 1,23 Casa di Caecilius
    Iucundus - North House

V 1,24 Taberna
V 1,25 Taberna
Structures
N wall
E wall
S wall
W wall
Features
Installations in floor
Latrine
Water conduits (terracotta pipes)
V 1,26 Casa di Caecilius
    Iucundus - South House

V 1,27 Taberna
V 1,28 Casa di Tofelanus
    Valens

V 1,29 Taberna
V 1,30 Taberna
V 1,31 Taberna
Facade - Via del Vesuvio
Facade - Via di Nola
Facade - Vicolo delle
    Nozze d’Argento

Facade - Vicolo di Caecilius
    Iucundus

Street - Vicolo delle
    Nozze d’Argento

Street - Vicolo di Caecilius
    Iucundus

3D MODELS & MEASURING TOOL
INSCRIPTIONS
EXCAVATIONS
OVERALL ASSESSMENTS